Project Description
- Client:Air Force Civil Engineer Center
- Location:Lackland Air Force Base, Texas
Benham provided 100% design documents for the renovation of Buildings 179 and 313. Building 179 is approximately 31,712 SF of which 19,000 SF was designed as a SCIF. The facility provides secure training and administrative areas to support Cyber Mission Force (CMF) training requirements. Building 313 is approximately 42,300 SF with the entire facility designed as a SCIF. The facility provides operations support for two new Cyber Mission Force (CMF) Squadrons.
Benham provided task order management, architecture, interiors, MEP engineering, structural engineering, fire protection engineering, communications, security, and cost estimating.