Wastewater Treatment Facilities And Municipal Lift Station Improvements

Project Description

Client: City of Ardmore
Location: Ardmore, Oklahoma

Benham was responsible for the design and conversion of Ardmore’s main 7.2 million gallon per day wastewater treatment plant process to a sequencing batch reactor system, major modifications to the plant hydraulics, design of a new 12,500 gallons per minute effluent lift station, design of effluent filters, modifications to the aerobic digesters, design of a new sludge dewatering facility, construction of a new co-composting facility (processing sewage sludge and yard waste) and major retrofits and repair of three of the City’s largest lift stations. The construction project was a multi-phase, multi-disciplinary, retrofit and new construction project, with features including:

  • Hydraulic modeling
  • Photogrammetric, ground and subsurface surveys
  • Soil borings
  • Utility research and coordination
  • Multidisciplinary engineering plans and specifications
  • Cost estimating
  • Re-use and adaptation of multiple existing structures to meet budget constraints
  • Retrofit of the pre-aeration and grit chamber equipment
  • New construction and incorporation of new processes while the existing plant continued to operate within compliance requirements
  • New 500 kW standby generator system and switchgear